Equipment List for Starting a Cabinet Factory

Which machines you need to start making cabinets, in what order to buy them, and how the setup changes as you grow.

The core machines

Every panel cabinet goes through the same four steps: cutting, edge banding, drilling and assembly. The machines map to those steps.

StepMachineWhy you need it
CuttingCNC nesting machine or panel sawTurns full sheets into parts
Edge bandingAutomatic edge banderCovers exposed edges for looks and moisture protection
Side drillingCNC boring / 6-sided drillingHorizontal holes for dowels and connectors
AssemblyCase clamp (optional)Square, fast carcass assembly

What to buy first

  1. Cutting machine. A nesting machine if your parts are varied and hole-heavy. See nesting vs panel saw.
  2. Edge bander. Manual edging limits output quickly. Even a compact automatic edge bander is a big step up.
  3. Side drilling. Start with simple horizontal boring, move to a 6-sided drilling machine when volume justifies it.

Supporting equipment

  • Dust collection sized for all machines running together
  • Air compressor and dryer
  • Cabinet design and nesting software
  • Tool sharpening or a supply of replacement cutters
  • Carts and racks for moving parts between stations

Setups by factory size

Our cabinet production line page shows starter, growing and factory configurations side by side. For a setup matched to your output and budget, send us your requirements.

Common questions

What is the minimum equipment to start making cabinets?

A cutting machine (nesting machine or panel saw) and an edge bander. Side drilling can be done manually at first, but a boring machine pays off quickly.

Should I buy new or used machines?

Used European machines can be good value if you have local service. New machines from China cost less than new European ones and come with warranty and factory support.

Get a quote for your project

Tell us what you make and roughly how many sheets you cut per day. We reply within one working day.

What you get back
A recommended configuration, FOB or CIF price and lead time.
Useful to include
Sheet size, board types, your power supply and any machines you already own.
Want to see it first?
Ask for a video call from the factory floor.

We only use your details to answer this request. Privacy policy