Cabinet Line Planner
Enter how many cabinets you want to make in a day. The planner works out how many sheets that is, which cutting setup keeps up, and what to put after it.
You need to cut
45 sheets a day
Can one machine keep up?
Suggested line
- Cut
- Edge band
- Drill
Operators on the line:
How this is calculated
Sheets per day is cabinets multiplied by sheets per cabinet. Each setup is given a typical time per sheet, including loading and clearing parts: . Available time is your shift hours at 85%, to allow for tool changes, cleaning and breaks. A setup is suggested when it runs at 90% of its capacity or less.
These are planning figures, not guarantees. Real output depends on your part mix, cutter choice and nesting software. Send us a typical cabinet list and we will work it out properly.
Read next
- Production line
Cabinet production line: three configurations
The machines at each station for starter, growing and factory setups.
- Comparison
ATC vs 4-process nesting machine
Tool capacity, flexibility and price compared.
- Price guide
CNC nesting machine price guide
What changes the price, and what to budget beyond the machine.
Get this line quoted
Tell us what you make and roughly how many sheets you cut per day. We reply within one working day.
- What you get back
- A recommended configuration, FOB or CIF price and lead time.
- Useful to include
- Sheet size, board types, your power supply and any machines you already own.
- Want to see it first?
- Ask for a video call from the factory floor.